New sales promotion for Huawei products
Optimizer Program
The program enables that for every purchased optimizer, an additional optimizer is provided for free, thus aiding in cost-effective installation and improving system efficiency.
The offer is exclusively for systems compatible with Huawei FusionSolar, including the 2-6KTL-L1, 8-10KTL-LC0, 3-10KTL-M1, 12-25KTL-M5, and 12-25KTL-MB0 inverters.
Usage Conditions:
- Installation Period: Between March 4, 2024, and May 31, 2024.
- For every new installation, the buyer can request an equal number of Huawei optimizers as per the program conditions.
- The PV system must be fully optimized (see the appendix).
- Compatible with installed and SmartPVMS-connected 2-6KTL-L1, 8-10KTL-LC0, 3-10KTL-M1, 12-25KTL-M5, and 12-25KTL-MB0 inverters. The inverter must be purchased from the EEA or Switzerland.
- Installers receive a certain amount of SUN2000-600-P and SUN2000-450-P2 optimizers for free.
- Installers must install at least 360 optimizers to qualify for the offer.
- Installers can request optimizers from Huawei between May 1, 2024, and June 30, 2024.
- Optimizers will be shipped to the installers after the request period.
Energy Storage Program for Existing Systems
Installers receive a free DC/DC module with the installation of ESS-LUNA 2000-5/10/15-S0 batteries, provided the number of installed energy storage units reaches 12.
The offer is compatible with specific inverters connected to SmartPVMS and installed before January 1, 2024, including the 2K-L1, 3K-L1, 3.68K-L1, 4K-L1, 4.6L-L1, 5K-L1, 6K-L1, as well as 3KM1-HC, 4KM1-HC, 5KM1-HC, 6KM1-HC, 8KM1-HC, and 10KM1-HC inverters.
Usage Conditions:
- Installation Period: Between March 7, 2024, and May 31, 2024.
- Compatible with 2K-L1, 3K-L1, 3.68K-L1, 4K-L1, 4.6L-L1, 5K-L1, 6K-L1, or 3KM1-HC, 4KM1-HC, 5KM1-HC, 6KM1-HC, 8KM1-HC, 10KM1-HC inverters installed before January 1, 2024, and connected to SmartPVMS. The inverter must be purchased from the EEA or Switzerland.
- Installers must install and connect the ESS-LUNA 2000-5/10/15-S0 device to the FusionSolar system between March 7, 2024, and May 31, 2024. The inverter must be purchased from the EEA or Switzerland.
- Installers receive one free DC/DC module for each mentioned installation and connection.
- Installers must install at least 12 ESS units to be eligible to claim the DC/DC.
- Installers can request the DC/DC modules between March 7, 2024, and June 30, 2024.