New sales promotion for Huawei products

News
2024. april 29.
New 2+1 and 1+1 promotion for Huawei inverters and optimizers! Contact us for more information.

Optimizer Program

The program enables that for every purchased optimizer, an additional optimizer is provided for free, thus aiding in cost-effective installation and improving system efficiency.

The offer is exclusively for systems compatible with Huawei FusionSolar, including the 2-6KTL-L1, 8-10KTL-LC0, 3-10KTL-M1, 12-25KTL-M5, and 12-25KTL-MB0 inverters.

Usage Conditions:

  • Installation Period: Between March 4, 2024, and May 31, 2024.
  • For every new installation, the buyer can request an equal number of Huawei optimizers as per the program conditions.
  • The PV system must be fully optimized (see the appendix).
  • Compatible with installed and SmartPVMS-connected 2-6KTL-L1, 8-10KTL-LC0, 3-10KTL-M1, 12-25KTL-M5, and 12-25KTL-MB0 inverters. The inverter must be purchased from the EEA or Switzerland.
  • Installers receive a certain amount of SUN2000-600-P and SUN2000-450-P2 optimizers for free.
  • Installers must install at least 360 optimizers to qualify for the offer.
  • Installers can request optimizers from Huawei between May 1, 2024, and June 30, 2024.
  • Optimizers will be shipped to the installers after the request period.

 

 

Energy Storage Program for Existing Systems

Installers receive a free DC/DC module with the installation of ESS-LUNA 2000-5/10/15-S0 batteries, provided the number of installed energy storage units reaches 12.

The offer is compatible with specific inverters connected to SmartPVMS and installed before January 1, 2024, including the 2K-L1, 3K-L1, 3.68K-L1, 4K-L1, 4.6L-L1, 5K-L1, 6K-L1, as well as 3KM1-HC, 4KM1-HC, 5KM1-HC, 6KM1-HC, 8KM1-HC, and 10KM1-HC inverters.

Usage Conditions:

  • Installation Period: Between March 7, 2024, and May 31, 2024.
  • Compatible with 2K-L1, 3K-L1, 3.68K-L1, 4K-L1, 4.6L-L1, 5K-L1, 6K-L1, or 3KM1-HC, 4KM1-HC, 5KM1-HC, 6KM1-HC, 8KM1-HC, 10KM1-HC inverters installed before January 1, 2024, and connected to SmartPVMS. The inverter must be purchased from the EEA or Switzerland.
  • Installers must install and connect the ESS-LUNA 2000-5/10/15-S0 device to the FusionSolar system between March 7, 2024, and May 31, 2024. The inverter must be purchased from the EEA or Switzerland.
  • Installers receive one free DC/DC module for each mentioned installation and connection.
  • Installers must install at least 12 ESS units to be eligible to claim the DC/DC.
  • Installers can request the DC/DC modules between March 7, 2024, and June 30, 2024.